9
CHECK INSTALLATION HARDWARE
6 wood screws
4 assembly screws
6 concrete wall anchors
Wall mount template
Locate the hardware accesories box packed
with the hood
Pliers
Duct tape
Safety glasses
Masking tape
DUCTLESS CONVERSION KIT
Accesory not included in the hood
TELESCOPIC DUCT COVER KIT
Accesory not included in the hood
Air deflector
Charcoal filter
4 springs
Duct cover support bracket
Duct cover
(dimension show for
reference only)
From 21- 9/32“
To 33 - 3 /32“
13-3/32“
10-19/32“
Measuring tape
Knife
Wire cutter/stripper
Spirit level
Gloves
Strain relief
8?round metal duct,
length to suit installation
Saw, jig saw or
reciprocating saw
Hammer
Screwdrivers:
Phillips (Posidrive) # 2
Torx # 2
Wire nuts
Electric drill with
5/16” and 3/8” Bits
TOOLS REQUIRED FOR INSTALATION
List of
Materials
Parts included in your hood
• Hood structure assembly with blower, transition.
• Lamp already installed.
• 2 Grease filters 30" or 3 Grease filters 36".
• Duct cover.
• Hardware bag with:
o Template
o Duct cover support bracket (1 piece)
o Use, care and installation guide
o Wood screws (6 pieces - 3/16" x 1" 3/4)
o Concrete wall anchors
(6 pieces - 1/8" x 3/8")
o Assembly screws (4 pieces)
Optional accessories
• Telescopic duct cover to fit ceiling height from 8' to 10'
• Re circulation KIT
• Non return valve
Materials required
• Duct tape
• Wire nuts
• Tape to mount template
• 6" rounded metal duct (lenght to suit installation)
Comments to this Manuals