14
Installation instructions
23
12
/16“
4
12
/16“
30“ Gas Cooktop (minimum)
24“-30“ Electric Cooktop (min)
6
1
/2“
6
1
/2“
Ceiling ducting
If the duct will vent straight up to the ceiling:
• Use level to draw a line straight up, from the centerline on the template to the ceiling.
• Measure at least 4 -12/16 ” from the back wall to the circle center of an 6-½” hole on the ceiling.
Wall ducting
If ductwork will vent to rear:
• Use a level to draw a line straight up from the centerline on the template.
• Measure at least 23 - 12/16" (the measure might vary dependig on the elbow used) above the pencil
line that indicates the bottom installation height, to the circle center of an 6-½” dia. duct hole (Hole may
be elongated for duct elbow).
House wiring location
• The junction box is located on the top left side of the hood.
• Wiring should enter the back wall at least 20" above the bottom of the installation height, and within 5-
7/8" and 4-7/8"of the left side of the centerline.
• Use for the installation 1/2" trade size UL listed metal conduit.
Comments to this Manuals