Arietta CHN001MX36 Instruction Manual Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 53
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
14
Installation instructions
Ceiling ducting
If the duct will vent straight up to the ceiling:
Use level to draw a line straight up, from the centerline on the template to the ceiling.
Measure at least 4 -12/16 ” from the back wall to the circle center of an 6-½” hole on the ceiling.
Wall ducting
If ductwork will vent to rear:
Use a level to draw a line straight up from the centerline on the template.
Measure at least 23 - 12/16" (the measure might vary dependig on the elbow used) above the pencil
line that indicates the bottom installation height, to the circle center of an 6-½” dia. duct hole (Hole may
be elongated for duct elbow).
House wiring location
The junction box is located on the top left side of the hood.
Wiring should enter the back wall at least 20" above the bottom of the installation height, and within 5-
7/8" and 4-7/8"of the left side of the centerline.
Use for the installation 1/2" trade size UL listed metal conduit.
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 52 53

Comments to this Manuals

No comments