Arietta ALS436SS Instruction Manual Page 5

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 4
5
Duckwork and wiring locations
Determine the exact location of the vent hood.
Locate the template packed with the literature.
Installation height: 30” electric cooktop/range or 24” to 30”
electric cooktop/range.
Use a level to draw a horizontal straight pencil line on the wall,
wich is your desired installation height.
Find the centerline of the cooktop. Use a level to draw a
vertical straight pencil line on the wall.
CHECK TO BE SURE THE LINE IS PERFECTLY
PERPENDICULAR.
Mounting the duct cover bracket
The duct cover bracket should be installed against the back wall
and ush with the ceiling. This bracket will hold the duct cover in
place at the top.
Secure the bracket to the wall:
Align the marked centerline on the bracket with the centerline
on the wall.
Mark 2 screws hole locations in the wall.
Drill
5
16” pilot holes in the marked locations.
Install wall fastener anchors.
Drive wood screws, by hand, into the fastener to allow anchors
to expand. Remove the screws.
Secure the bracked to the wall with wood screws and/or
fasteners.
Ceiling ducting
If the duct will vent straight up to the ceiling:
Use level to draw a line straight up, from the centerline on the
template to the ceiling.
Measure at least 4
3
4” from the back wall to the circle center of
an 6
1
2” hole on the ceiling.
Wall ducting
If ductwork will vent to rear:
Use a level to draw a line straight up from the centerline on the
template.
Measure at least 23
3
4”(The measure might vary depending on
the elbow used) above the pencil line that indicates the bottom
installation height, to the circle center of an 6
1
2” diameter duct
hole (Hole may be elongated for duct elbow).
House wiring location
The junction box is located on the top left side of the hood.
Wiring should enter the back wall at least 20” above the
bottom of the instalation height, and within 5
7
8” and 4
7
8” of the
left side of the centerline.
For ceiling vent ducting
Ceiling
4
3
4” circle
center to wall
6
1
2” dia.hole
Circle center at
23
3
4” above the
marked bottom
pencil line
Horizontal straight
pencil line
For wall
vent duct
Install framing for hood support
If drywall is present, mark the screw hole locations. Remove
the template.
Cut away enough drywall to expose 2 vertical studs at the holes
location indicated by the template.
Install two horizontal supports at least 1”x6” between two wall
studs at the bottom and top mounting holes installation location.
The horizontal support must be ush with the room side of the
studs. Use cleats behind both sides of the support to secure to
wall studs.
Reinstall drywall and renish.
IMPORTANT: Framing must be capable of supporting 100 lbs.
6
1
2 minimum opening
for ductwork
Cleats view
from rear
1˝ x 6˝ minimum
mounting support
Centerline of
installation
space
Installation Instructions
Page view 4
1 2 3 4 5 6 7 8 9 10 ... 23 24

Comments to this Manuals

No comments